Building Construction Update, January 2019

Installation of the exterior finish materials is complete. And, with the site fencing down, the sidewalk along the 17th Street Pavilion and Wewatta Street is now open in front of the building. Swing by to get a first-hand look! Insert Image

Five of our retail tenants, Pure Barre, Blo Blow Dry Bar, A Line Boutique, Slifer Smith & Frampton – Denver and Union Hall, have started building out their spaces. Kaffe Landskap will begin their build out soon.

Subcontractors are finishing work on levels 18 and 19. The majority of their focus has shifted to the punch list process and final inspections. Insert Image

The pool and spa have been filled with water which is really exciting to see. The fire pit, pavers and fencing on the 18th floor pool deck have all been installed.

The Owners’ Lobby on the mezzanine (level 1.5) is almost complete and will be ready to welcome owners soon.

Inside the garage, striping is complete and wheel stops have been put in place. We’re currently testing the parking garage equipment to ensure everything operates smoothly.

Terrace level lighting has been turned on. Check out the incredible view from the 5th floor terrace overlooking Union Station at dusk. Wow, impressive!

We’re very close to completing the building so keep an eye out for our next update. And remember, you can always  check out our current progress with our construction web cam.